Selecting the Controller and Setting Run Times
The next step in building a model is to select the controller and specify the run times and timestep for the run. These actions are performed from the Run Control dialog.
• Selecting
Control, then
Run Control Panel, or selecting the
Run Control toolbar icon,
brings up the Run Control dialog.
• From this dialog, specify the following:
– Controller
– Timestep length
– Initial date
– Finish date or number of timesteps.
See
Controllers in User Interface for a detailed description of this dialog.