Key Control Point Space Use
This category appears only if the Operating Level Balancing method is selected in the Flood Control category.
Note: This method category and its methods exist for convenience of algorithm development, and they may not be available in the future.
The allocation of space by the key control point balancing method may be respected or ignored, for purposes of experimentation.
Key Control Point Balancing Share
This is the default method.
On all passes but the last, allow subject reservoirs to use only as much space at key control points as has been allocated to them. A reservoir that is not a subject of a key control point gets no share of that key control point’s empty space on any pass but the last. On the last pass, all space is available on a first-come, first-served basis.
There are no slots specific to this method.
First-Come, First-Served
Ignore the space allocations at the key control points. Every full reservoir has rights to space at key control points on a first-come, first-served basis.
There are no slots specific to this method.