System Control Table (SCT)
:
Using the SCT
: Using an SCT in Operations
Using an SCT in Operations
The procedures in this section allow you to perform RiverWare operations from the SCT. You can use the SCT as your single point of system control to modify values, run simulations, and analyze results.
Topics
•
Run a model simulation from the SCT
•
Enable or disable dispatching
•
Set flags on series slot values
•
Set a target operation
•
Clear a target operation
•
Show or hide simulation diagnostic messages
Revised: 07/03/2024
This site works best with JavaScript enabled